Operations

Schedule โ€” plan of record

ScheduleRevision / ScheduleInterval. One board, configured per operation.

Preassembly & staging โ€” Staging is sequenced against what the next operation needs, so the run window is the subject and changeover is not a concept here. This is where fork-truck observations arrive.
Window
FiltersApplied server-side; the query narrows, not the render
Intervals shown
0
Assets
0
Planned hours
0.0
h
Unscheduled (excluded)
0.0
h
Intervals6 columns, declared for Preassembly & staging
โณ
Reading the plan
Querying ScheduleInterval
Deviations โ€” not yet availableS2 ยท authorised by Amendment H-1, not yet built

Cycle-time updates and fork-truck observations are deviations against the plan in force, not edits to it. A published plan that silently becomes whatever happened makes attainment-against-plan meaningless โ€” the same failure as a standard refreshed to the last actual. No deviation grain exists yet, so this board is read-only by construction and there is no control here to suggest otherwise.

Preassembly & staging gains under H-1: material readiness ยท fork-truck deviation ยท staged-for run

This is the published plan. Production Schedule is a finite-scheduling simulation over synthetic batch history and reads no database. The work queue is the same plan at real-time grain (D4). Two subjects one word apart โ€” flagged under R1, not resolved here.