Platform
Setup & Health
Meridian Industrial β 10 steps to activate operations + live system signals below
Time remaining
19h
of ~20h total
Overall completion2% Β· 19h remaining
2% auto-filled (27m saved) 0% manually entered (<1m) remaining: 19h
Tip: the three middle columns below are parallel tracks β once Step 1 is green, all three unlock and different team members can work them simultaneously. Steps 6, 7, 9, 10 are join points waiting on multiple tracks.
Foundation
Tenant identity β every track depends on this
1
πSite Profile
~1.5hIndustry, identity, facility, cost centers, buildings-summary, process β 6-section accordion
π Manual entryβ
~1.0h left
β
Spatial Β· Equipment Β· Floor
Map β equipment β operator stations
2
πͺRegister Plant + Digital Twin
~1.0hPin each building on OSM, capture lat/lng + sqft + address. Spatial substrate every later step binds to β every piece of equipment will hang off this map.
depends on Β· Step 1
π€NAIP imagery + auto-detectβ
π Pin manually on OSM
~1.0h left
β
5
πOT Systems Integration
~4.0hDiscover PLCs, import tag DBs, publish CESMII i3x compliant aliases β populates below the L3.5 DMZ
depends on Β· Step 2
π€PLC auto-discoveryβ
π₯Tag DB CSV importπ Manual tag entry
~4.0h left
β
9
πOperator Readiness
~3.0hAgentic HMI build Β· process-sheet templates Β· capture-coverage matrix Β· coaching cards Β· label library + printer routing
depends on Β· Steps 2 + 5 + 8
β¨Agentic buildβ
π Hand-edit templates
~3.0h left
β
Business Β· Data
Templates β ERP/CMMS/QCMS β conformity
3
π₯Download Setup Templates
~15mBulk-entry spreadsheets for equipment / workforce / BOMs / tag bindings β customer fills offline
depends on Β· Step 1
π₯Excel templates (one-shot)β
~15m left
β
4
π‘Connect Business Systems
~6.0hUpload filled templates Β· connect ERP/CMMS/QCMS/WMS APIs Β· ingest documents β populates above the L3.5 DMZ
depends on Β· Steps 2 + 3
πLive API connectionβ
π₯Excel template upload (one-shot)π Manual entry
~6.0h left
β
6
ποΈFabric Interrogation
~30mMeasure IT + OT coverage on the canonical fabric Β· phase indicator + countdown Β· security-block mitigation Β· coverage-% gate
depends on Β· Steps 4 + 5
β¨Platform-runβ
~30m left
β
7
π§ͺData Conformity Review
~2.0hAgentic QA across all six segments. Inline fix, or download β fix offline β upload back
depends on Β· Step 6
β¨Agentic QA + inline fixβ
π₯Download β fix offline β upload
~2.0h left
β
Activate
All tracks merge β cross-validation + go live
10
β
Review & Activate
~1.0hCross-validation, financial impact, go-live readiness check, cutover button
depends on Β· Steps 1β9 all green
β¨Readiness check + activateβ
~1.0h left
β
External setup-time data feedsPublic authorities the platform leverages during setup. Each feed caches per-tenant; once the appliance is LIVE the door closes and the cache is the only source.
Loading external feed statusβ¦
Live system healthExternal-dependency signals + proposed remediations. The dot on the Setup tile in the rail mirrors the worst severity here.
loadingβ¦