Hand these to the customer's ops team. They fill offline where the data already lives β you upload into the matching setup tile later.
Every piece of equipment in the plant. Tag, name, type, area, manufacturer, RAV. The asset backbone for OEE, maintenance, and reliability.
tagnameassetTypeareaNamemanufacturermodel+4 moreOperators, technicians, and support staff with their role codes, shift assignments, and training certifications.
badgeIdnameroleCodeshiftemailhireDate+1 moreFinished goods with their BOM lines β what goes into each batch, in what quantity, at which step.
productCodeproductNamefamilybatchSizeGalbomSeqmaterialCode+4 moreStep-by-step production sequence per product. Standard cycle and setup times drive scheduling and OEE baselines.
productCoderoutingVersionstepSeqoperationNameequipmentTypeCodestdCycleMin+2 moreLinks each piece of equipment to its live PLC tags. Scan rate, historization, and a canonical semantic tag for cross-plant analytics.
equipmentTagplcTagdescriptionuomtagTypescanRate+2 moreAccounting rollup tree β how this site reports into the parent org. Used only if you skipped the inline Cost Centers section in Setup #1.
codenameannualBudgetUSDglAccountrollupTo